CloudPrisma CloudPrismaAccelerate the Innovation
Book a walkthrough
Built for plant heads

Every machine, every check, every reject — on one screen

Sensors read your machines directly. The quality plan runs on the operator's tablet. Every record is signed and time-stamped for the audit.

30%
fewer defects
40%
faster issue closure
20%
higher efficiency
PLANT 01 · SHIFT A
Live
Plant OEE
{{ heroOee }}%
Uptime
{{ heroAvail }}%
Speed
{{ heroPerf }}%
Quality
{{ heroQual }}%
Plant control room with live production dashboards
CNC-04 stopped 11 min → escalated to maintenance
Bore Ø 9.014 mm signed by inspector · 14:22
Live plant view

Your whole shop floor, one screen. Tap a machine.

Sensors stream machine state, counts and rejects every second — older machines included.

{{ sel.id }}
{{ sel.name }}
{{ sel.state }}
Uptime
{{ sel.a }}%
Speed
{{ sel.p }}%
Quality
{{ sel.q }}%
Part running{{ sel.part }}
Shift count{{ sel.count }}
Rejections this shift{{ sel.rej }}
Operator{{ sel.op }}
{{ sel.note }}
Plan → tablet → audit

One check, followed end to end

{{ stepData.title }}

{{ stepData.body }}

{{ pt.text }}
{{ stepData.screen }} {{ stepData.clock }}
OPERATION
LIMITS
HOW OFTEN
INSTRUMENT
10 · Turning
14.20 / 14.30
5 pcs/hr
Micrometer
20 · Facing
32.00 / 32.10
2 pcs/hr
Vernier
30 · Boring
8.98 / 9.02 ◆
Every piece
Plug gauge
Part: PART-A Revision 06 ◆ Critical dimension
Quality inspector measuring a machined part
Operator · Shift ACNC-04
Boring · piece 41 of 120
9.014
limits 8.98 – 9.02 mm
Accept
Reject
Change pendingNew material batch
Tool wear318 / 900 pcs
The operator sees only the check that is due now
14:22Reading 9.014 acceptedInspector
14:05Material batch change approvedQuality head
13:482 pcs rejected · burr at boreOperator
13:20Tool changed at end of lifeShift engineer
12:00Batch opened · 1,200 pcs inLine leader
Audit pack
Exported in 8 seconds
Batch trace
1,183 accepted / 17 rejected
Operator scanning a part barcode for traceability
The platform

Not a dashboard. The shop-floor system of record.

Start with one module, add the rest as you go.

{{ tabData.title }}

{{ tabData.body }}

{{ pt.text }}
{{ r.text }}
{{ tabData.screen }}
OPERATION
LIMITS
HOW OFTEN
SIGNED BY
10 Turning
14.20 / 14.30
5/hr
Inspector
20 Facing
32.00 / 32.10
2/hr
Line leader
30 Boring ◆
8.98 / 9.02
Every pc
Operator
40 Hardness
58 / 62 HRC
1/batch
Lab
Revision history
“Bore tolerance tightened after customer complaint.” — Quality head, 12 Mar
Resolved: Revision 06 released, operators re-briefed
PEOPLE
New operator on boring
APPROVED
MACHINE
Spindle serviced
APPROVED
MATERIAL
New material batch
PENDING
METHOD
Feed rate reduced
APPROVED
Approval chain
OPERATOR ✓ → LINE LEADER ✓ → QUALITY HEAD ⟳ → PLANT HEAD
Until the chain closes, the operation stays flagged on every tablet.
Shift huddle at the line reviewing changes
Top rejection causes · shift A17 / 1,200
{{ p.label }}{{ p.n }} pcs
BATCHSUPPLIER LOTINOKREJ
B-2291SL-7711,2001,18317
B-2290SL-7701,2001,1964
B-2289SL-76890088911
Every rejection carries its cause, operator, machine and batch — so a complaint resolves in minutes.
{{ t.name }} {{ t.used }} / {{ t.life }} pcs
{{ t.note }}
Raised automatically: change the cutting insert on CNC-04 within 62 pieces.
Audit schedule
Daily checks92/92
Weekly13/13
Monthly2/3
Process audit4/4
Open findings
Gauge calibration overdue · due 3d
Work instruction missing at station · overdue
Operator skill levels
OPERATOR
TURNING
FACING
BORING
Operator A
Expert
Expert
Training
Operator B
Expert
Skilled
Expert
Operator C
Skilled
Not cleared
Not cleared
An operator below the required level cannot be assigned to that operation.
CNC-04 STOPPED · 11 MIN#1182
OPERATOR · 0 min→ SHIFT ENGINEER · 5 min→ MAINTENANCE HEAD · 10 min ⟳
Material approval pending 22 min → QUALITY HEAD
Rejection rate 4.1% above 3.0% target → LINE LEADER notified
CLOSED · coolant low on VMC-02 → resolved in 6 min
Your rules
WHEN a machine is stopped over 10 min
THEN notify maintenance and escalate every 5 min
Floor display showing live line status
Machine monitoring

OEE that comes off the machine, not a register

Measured against your real working time, not the clock on the wall — so the number holds up in any review.

Shift timingAs per your roster
Tea and lunch breaksExcluded
Planned meetings and 5SExcluded
Basis for OEEActual working time
PLANT OEE · SHIFT A · {{ today }} Live
{{ oeeNow }}% Plant OEE
Uptime{{ availNow }}%
Speed{{ perfNow }}%
Quality{{ qualNow }}%
Hourly output vs targetpcs / hr
{{ h.hr }}
Top downtime causes
{{ d.label }}{{ d.n }}m
Shift total
{{ shiftTotal }}
pcs · target 3,600
Rejections 47 · 1.3%
Before / after

Drag the handle. Same shift, two realities.

Left, the register-and-spreadsheet plant. Right, the same shift on CloudPrisma.

Shop floor running on digital work instructions
Digital
Records foundinstant
Missing signatures0
Rejection visibilitylive
Shop floor still running on paper registers
Paper
Records found3 days
Missing signatures14
Rejection visibilitynext month
Business case

What is your plant losing this month?

Enter one line's numbers.

{{ shifts }}
{{ downMin }} min
{{ target }}
{{ output }}
{{ rejectPct }}%
{{ partValueLabel }}
Your line today
{{ calcOee }}% current OEE
Uptime
{{ calcAvail }}%
Speed
{{ calcPerf }}%
Quality
{{ calcQual }}%
Recoverable in year one
Scrap avoided{{ scrapSave }}
Stoppage recovered{{ downSave }}
Total per year{{ totalSave }}
Indicative, based on improvements measured at deployed plants.
Model this for my plant
Deployed, not piloted

Running on real shop floors

Inspection station at an automotive supplier
Automotive component

Quality gates now block the next operation instead of catching problems at final inspection.

30% fewer defects
Floor display showing live line status
Oil and gas services

Nothing sits unowned — an unanswered issue climbs a level every five minutes.

40% faster closure
Production dashboard on the shop floor
Press and machining

Retrofit sensors on twenty-year-old presses turned downtime reasons into data.

20% more efficiency
Trusted by quality-driven manufacturers
Rane NSK Steering Systems
Sanchez
Nitto Denko
Mesquite
Rollout

Six weeks to a live line, without stopping production

WEEK 1

Walkthrough

We map your machines, checks and shifts, then return a scoped plan at a fixed price.

WEEK 2–3

Sensors fitted

Installed during planned breaks. Tablets and floor displays go up alongside.

WEEK 4–5

Plans loaded

Your existing quality plans and formats go in as they are. Operators train on their own parts.

WEEK 6

Live

The line runs paperless, ERP sync is on, and we review the first audit pack with your QA head.

Works with older machines On-prem or cloud ERP integration On-site support across NCR
For global clients

Need the engineering team, not the product?

The engineers who built this platform also take on custom software, cloud and AI work.

Explore global services
Get started

Bring us your worst line. We'll show you its real OEE in 30 minutes.

A working session with our engineers — bring one part number and a month of rejection data.

Book a walkthrough support@cloudprisma.io